Gold Member Since 2009
Audited Supplier
Dongyue Machinery Group Co., Ltd.

AAC Production Line, AAC Panel Production Line, Panel Production Line manufacturer / supplier in China, offering AAC Fly Ash Panel Production Line, Competitive Price Concrete Block Mold Machine in India, AAC Block Making Machine Low Cost and so on.

(/ )

Supplier Homepage Product AAC block production line AAC Fly Ash Panel Production Line

AAC Fly Ash Panel Production Line

FOB Price: Get Latest Price
Min. Order: 1 Piece
Production Capacity: 100 Sets/Year
Transport Package: According Customer Request
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: aac machine
  • Cutting Cycle: 5 Minutes Per Mould
  • AAC Block Advantage: Light Weight, Durability, Good Anti-Shake
  • Anti-Pressure Strength: More Than 3.5 MPa
  • Addition: Have Cooperate with Germany
  • AAC Block Production Capacity: 50000-300000m3 Annual
  • Trademark: DONGYUE
  • Origin: Linyi, China
  • Certification: ISO9001: 2000, CE, SGS
  • Cutting Accurate Degree: Less Than 3mm
  • AAC Block Usage: Inner Wall, Villa, House
  • Raw Material: Sand, Lime, Gypsum, Cement, Chemical
  • Overseas Office: Ahmedabad, Jarkarta, Hanoi
  • Method: Autoclaved Aerated Concrete
  • Specification: SGS, CE, ISO9001
  • HS Code: 84748090
Product Description
AAC fly ash panel production line

1. AAC fly ash panel production line simple introduce

AAC block (light brick ) is the light and porous buidling material. It has
Light keeping temperature cant burn and other advantages. It can be made into many kinds
Of bricks(for example: 600X200X100, 80X80X180, 240X115X53, 600X200X125), they could
Be used industry building and common building. They are more and more popular in the
World. In the future, they will replace the Clay brick completely.

2. AAC fly ash panel production line common conception

Common concrete density is usually 1600-2400kg/m3, but Areated concrete are 500kg/m3, 600kg/m3
, 700kg/m3. It has not the big grain, main use silicon material (for example: Coal ash, sand,
Stone dust and others ), through making the material small for example sand, they can be
Used directly if has enough degree of small (for example coal ash. Mixing calcium material
Lime cement water to a special slop, then add the aluminum dust and the additive. Make the
Aluminum dust and the special slop have a Chemical reflect. Then produce Hydrogen to make
The concrete slop to expanding or swell, foam. Next, put them into the curing room to
Concreting cutting steaming curing, last, there will bacome the light brick, the porous rate
Is 70-80%.

3. AAC fly ash panel production line advantage
1)light weight
Areated concrete density is usually 400-700kg/m3, (according the market in produce ), same as
1/3 of clay brick and 1/5 common concrete. So use the Light brick can reduce the weight of
The build more, and also reduce the beam of roof and pillar press best. Then you can see, it
Can save the material and cost, it also fighting shaking.
2)keeping temperature
It has many are porous, the delivery hearting coefficient is 0.9-0.22W/(mk), the same as 1/4
Or 1/5 of clay brick, so it is best materials now in the world.

4. AAC fly ash panel production line detailed production description

AAC block machine plant, light weight block machine, aerated concrete block machine, AAC brick machine line, light weight brick machine, aerated concrete brick machine, autoclaved aerated concrete block machine.

1)Product weight is according to 600kg/m3 to control.
2)annual capacity 200, 000M3.
3)set raw material proportion: Cement 6.5%, raw lime 23%, flyash 68%, gypsum 3%, aluminum
Paste powder 350G/M3.
4)water and material rate 0.631
5)one mould product 2.88M3
6)Casting slurry cycle time 5-6 minutes, cut cycle time 5 minutes.
7)casting slurry temperature 38-42 degree
8)body quiet stop. Time is 1.5-2.5housr, temperature 50-90 degree, after quiet stop body
Strength is 0.15-0.18Mpa
9)Steam curing cycle time, come in and out autoclave about 0.5hour, steam curing cycle time
About is 6 hours/1.6Mpa, total 6.5 hours.
Send your message to this supplier
Avatar
Miss Selena Sun
General Manager
*From:
To: Miss Selena Sun
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now