2015 Best Selling Steam Boiler and Autoclave for AAC Plant

Product Details
Customization: Available
Certification: ISO/Ce/SGS
Type: AAC Brick Making Machine Plant
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2009

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
529
Year of Establishment
2004-07-09
  • 2015 Best Selling Steam Boiler and Autoclave for AAC Plant
  • 2015 Best Selling Steam Boiler and Autoclave for AAC Plant
  • 2015 Best Selling Steam Boiler and Autoclave for AAC Plant
  • 2015 Best Selling Steam Boiler and Autoclave for AAC Plant
  • 2015 Best Selling Steam Boiler and Autoclave for AAC Plant
  • 2015 Best Selling Steam Boiler and Autoclave for AAC Plant
Find Similar Products

Basic Info.

Model NO.
AAC
Total Cost
9acers-25acers
Installation Service
Yes
Raw Material
Sand/Cement/Lime/Gypsum/Aluminum Paste
Workshop Area
2000-3000m2
Voltage
as Per Requests
After-Sales Service Provided
Overseas Service Center Available
Capacity
50000-300000 PCS/8hr
Main Market
India/Iran/Buma/Bulgaria/Indonesia/Mongolia
Trademark
DONGYUE
Origin
Shandong, China (Mainland)

Packaging & Delivery

Package Size
3800.00cm * 2300.00cm * 2950.00cm
Package Gross Weight
21000.000kg

Product Description

2014 New    steam boiler and autoclave for aac plant

 

2015 Best Selling Steam Boiler and Autoclave for AAC Plant

 

Dongyue machinery group are leading AAC block machine manufactuer in China,Our AAC lines spread in India,Indonesia,vietnam,Bulgaria,Russia Kazakhstan.

 

Dongyue AAC machinery inherit Germany Technoloy. We already starts cooperation with Germany company AAC Concepts to upgrade our AAC machinery

2015 Best Selling Steam Boiler and Autoclave for AAC Plant

 

1.  aac block making machine line (15 lines in India) preparation work

 

1. Land of 4 Acres is Required

 

2. Workshop area -approximately 30000 Sq Mt or 30000 sft

 

3. Total Plant area( construction area ) = 4500 Sq Mt or 45000 sft

 

4. Power connection needed - 500 KVA

 

5. Ideal manpower requirement is 40 nos. (Skilled - 10, semi skilled-10 and unskilled 20)

 

6. Skill division 40 workers = Main plant 2 nos of 10 hour shifts 15 people each + Boiler & Autoclave section 3 people in 3 shifts of 8 hours

 

7. Water requirement approximately 225 Tons per Day.

 

8. Fly Ash requirement approximately 225 Tons per day

 

9. The above power and plant calculations are based on Fly ash based AAC without Lime Crushing Unit and Ball mill for sand. If the process so require, we may add them at a later stage. But surely we give provisions for them at site right from installation stage

 

10. 300 working days is considered in a year through 333 days a year is possible.

 

11 Fly to be provided free of cost by power plants. Only transportation to be arraigned by Project. Average distance of 250 KM

 

12. Carbon Credit is estimates are for reference purpose. The Project owner must handle his part of CDM project to get Carbon credits, through independent consultants. Please check the form of CDM after 2012

 

13. AAC Blocks of all sizes will be manufactured according to the market requirement, though mainly stipulated sizes as per the BIS standards

 

 
 

2. aac block making machine line (15 lines in India) WORKING PROCESS

 

The Process of manufacture is simple t follow, and complex to implement. 

 

First, the Fly Ash is mixed with water, and made Slurry in a slurry mixture. If Sand is used as a base material, we need a ball mill to grind the sand to fine power. The slurry making process is same sand.  

 

After Slurry is made, the slurry is stored in slurry storage tank, where the slurry is constantly agitated. Care is taken to run the slurry storage tank all the time, so that is never settles down the particles. 

 

Then a weigh batcher weighs the Slurry, lime, OPC, Gypsum and aluminum power in preset quantities, and mixes thoroughly. The mixture also pours the mix into the Mould carried n the mould cart. The full pouring of the mixture is just enough to fill around 50% of the mould.   

 

Then the mould is kept in a warm chamber for 2 hours, so that the aeration and the light initial setting takes place.    Next process is de-molding process of the big block, in which a sophisticated overhead hoist takes the mould, demoulds the block.   

 

Next process is the level wire cutting of the Block, while the block passes on the cutting trolley through the series of wires. This process follows a vertical wire cutting where as the block remains stationary, and the cutter cuts the block vertically.   

 

The final cut blocks are Steam cured in autoclaves for 8 hours at 12 KG/Sq cm pressure, and 200D C


 

 

3. aac block making machine line RAW MATERIAL REQUESTS

 

 

Fly-Ash:     A lot has been said about this raw material in this Project Profile itself. But this Raw material is freely available in Thermal Power plants. There are no taxes on this item whatsoever. Transportation charges are only to be attended by the entrepreneur.    

 

Sand:   Except fly ash,Sand can be the main material too.The requests is that the Silica content is above 69% .

 

Lime:     Active powered lime is a requirement for giving the real aeration to the product. In phase 1 we can aim to buy the active lime directly. In phase -2 we can think of having backward integration and making a lime powering unit at site to have a more competitive advantage, We can also think of a lime  burning klin inside the factory premises.   The project financials however have not considered  the costs of powering unit, and the lime kiln in this project.     Different qualities of lime are available, and depending on the raw materials, the mix design can be chosen to get the optimal quality of production.  

 

OPC.    This Project aims to utilize OPC cement as main binder material. It will give faster strength to the bricks, besides giving  improved consistent quality. It also ensures a better cost effectiveness for the same. Using OPC will be a standardized practice. The other prime advantages of using OPC (compared to other binders) is it's easy availability locally through nationwide Retail Network of Cement Companies.   

 

Gypsum:     This too is an industrial waste. This is available as an industrial byproduct of Fertilizer Plant. Gypsum is responsible to give long term strength to the Blocks.      

 

Aluminum Power.     Finely ground Aluminum power is used in very limited quantity ( less than 0.5%), so that it reacts with active lime, and silica in base material to make the aeration,

 

 

Name

Unite

Cement lime fly ash

Fly ash

%

65-70

Cement

%

6-15

Lime

%

18-25

Gypsum

%

3-5

Aluminum powder paste(600kg/m3)

1/10000

8

Water & material rate

 

0.6.-0.65

Casting system

°C

36-40

Aluminum mixing time

S

30-40

4.  aac block making machine line ) RAW MATERIAL FORMULAR

 

Name 

Unit 

Cement lime sand 

Sand 

%

55-65

Cement 

%

10-20

Lime 

%

20-30

Gypsum 

%

2-3

Aluminum powder paste(600kg/m3)

1/10000

8

Water & material rate

 

0.65-0.75

Casting system

°C

35-38

Aluminum mixing time

S

30-40

 

2015 Best Selling Steam Boiler and Autoclave for AAC Plant2015 Best Selling Steam Boiler and Autoclave for AAC Plant2015 Best Selling Steam Boiler and Autoclave for AAC Plant2015 Best Selling Steam Boiler and Autoclave for AAC Plant

 

   Technology transfer cooperation with germany AAC CONCREPT GHBM

 

 

  

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier