Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Dongyue Machinery Co., Ltd. was founded in 2004 with a registered capital of 210.15 million yuan, covering an area of 133 hectare and employing more than 1,200 people. In 2016, it was officially listed on stock and the stock code: 838849. The company has three subsidiaries: Linyi Dongyue New Building Materials Co., Ltd., Linyi Dongyue Import and Export Co., Ltd., and Linyi Dongyue Pressure Vessel Equipment Manufacturing Co., Ltd.
The company's main products include autoclaved aerated concrete slab/block production lines, large and medium-sized block forming machines, autoclaves and other pressure vessels, boilers, autoclaved sand-lime brick production lines, aerated concrete blocks, plates, sand-lime bricks, Building materials such as steel insulation composite panels, color steel tiles, and prefabricated integrated houses.
CHINA NO.1 AAC BLOCK / PANEL MACHINERY MANUFACTURE
1-The Biggest AAC Block/Panel Machinery Manufacture in China
2-The Only China AAC Manufacture who Cooperates with Germany Company-AAC Concept GMBH
3-China Highest Self Own Equipment Assembly Rate of AAC Machinery-Over 85%
4- The Most Complete Systematic AAC Industrial Sector Configuration
5-The Only AAC Manufacture to Have Its Own 3 Training Centers
6-Have the Highest Market Share
7-The Only AAC Manufacture Sets Up 4 Oversea Market Office and After Sale Service Centers
8- Nine Invention Patents 31 Utility New Model Patents, Leading Enterprise in the Development of Industry Standards
9-The Most Powerful AAC Panel Application Expert In China
Chapter I Sales Conditions
1.1Payment Terms
Total contract price will be paid by the buyer to seller the as per the followings:
-30% of total contract price will be paid by T/T as down payment.
-70% of total contract price will be paid by T/T or an irrevocable L/C at sight against shipping documents.
Or other terms to be agreed upon.
1.2Delivery Terms
All machines will be ready for delivery in seller's workshop within 180 days after the contract come into force.
1.3Packing
To be packed suitable for long distance ocean transportation and well protected against damage, moisture, shock, rust and handling.
The equipment will be kept in covered and guarded areas when it arrives at the Buyer's plant. All the precautionary measures necessary for the correct protection of the materials will be taken while awaiting its installation.
1.4Warranty
The Seller shall guarantee that all the contract equipment are completely brand-new and conform to the technical specifications. The mechanical guarantee on machinery and equipment shall be 12 months from the acceptance date, or 18 months from the date of first delivery of the goods in case the commissioning cannot be carried out due to the Buyer's reasons. During the warranty period, if the accessories or equipment are damaged, due to the Buyer's insufficient maintenance or improper operation of the equipment, the Seller will replace or repair it at Buyer's charge. If the said damages are due to faults in design, poor quality or workmanship, the Seller will replace or repair it at his own cost.
1.5Installation
Includes the following phases:
-Positioning of the equipment in conformity with the plant layout,
-Possible guide of unpacking,
-Guide Assembling of what is necessary for the completion,
-Guide Connection with various electrical, pneumatic, or other supply sources,
-Guide Adjustment of the equipment; leveling; running of motors,
-Seller will arrange following engineer do the install service:
Mechanical Engineer
Electrical Engineer
Boiler Engineer
Ball Mill Machine Engineer
1.6Start-Up
This includes all actions necessary to put the contract equipment in operation until the completion of the production acceptance standards.
Upon what above-mentioned processing finish, the Acceptance Certificate of the Plant shall be issued.
1.7Training
Buyer's personnel shall be trained at an AAC factory in seller's country and, further trained at buyer's contract plant. The fee for training could be negotiable between seller and buyer.
1.8Others
a.All taxes and duties including government charge on services, import duty, income tax, and so on, incurred in the Buyer's country during the implementation of the contract shall be borne by the Buyer.
b.The offer price includes the charge for supervision of installation and start-up. But the international round tickets, lodging and local transportation for the seller's technicians shall be at buyer's account.
1.9Validity of Quotation
15 days from the date of quotation.
Chapter II General Description
2.1This project is designed for output 3000 m3 per day AAC block production line.
2.2Main technical data:
Product: AAC block
Capacity: 3000 M3 / Day
Cake size: 6.0 x 1.2 x 0.6 M
Finished product size:(100, 150, 200, 250) x 200 x 600 mm
Density: 500~650 Kg/m3 (controlled as per formula)
Autoclaving cycle: 10 h
Steam working pressure:~1.2 MPa
Working days:300 days / year
Working shifts:2.4 shifts / day
Working hours:10 hours / shift
2.3Design Consideration :
Power Supply: 3-phrase, 380V/50Hz
Fuel: Coal (caloric value: 5,600kcal/kg & or as customer's requirement)) The quotation refers to layout as per enclosure.
The plant is based on a theoretical capacity of 3000 m³/day in a 2.4shift operation.